Skip to main content


Restoration of traffic in Quarata.

#at_Arezzo From Monday 11th November 2024, the passage within the inhabited area of Quarata will be reopened to vehicular traffic.

The lines P/1 and LAP109 will resume their regular route.
At the same time, the temporary stops located along the SP1 will be abolished.

Back to top

Interactive map