Skip to main content


LA TORRE-BOVEGLIO-PARIANA-VILLA BASILICA- COLLODI-PESCIA

E21

Winter timetable (from 15/09)

Download line timetable and map

#at_Lucca
From the 17th June 2024 until the end of the roadworks, due to renovation works on the bridge over the Pescia stream, in the Ponte all’Abate area, the route of the E6 line is changed. For more information

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map