Skip to main content


Diversion of line E6 in loc. Ponte all'Abate.

#at_Lucca From 17th June 2024 until the end of the roadworks, due to renovation works on the bridge over the Pescia stream, in the locality of Ponte all’Abate, the route of the E6 line is modified.

Back to top

Interactive map