Skip to main content


LUCCA-PICCIORANA-LUNATA-ZONE-LAPPATO-P.TE ABATE-PESCIA

E6

Winter timetable (from 15/09)

Download line timetable and map

#at_Lucca From 17th June 2024 until the end of the roadworks, due to renovation works on the bridge over the Pescia stream, in the locality of Ponte all’Abate, the route of the E6 line is modified.

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map