Skip to main content


RIGNANO SULL'ARNO-PONTASSIEVE-FIRENZE

350 A

Winter timetable (from 15/09)

Download line timetable and map

#at_Firenze

🚍From Monday 9th December 2024, for line 350A, the weekday journey at 5:55 from Rignano Cimitero to Firenze Montelungo will be brought forward by 5 minutes and will therefore depart at 5:50.

#at_Firenze

From the start of service on Friday 22nd November 2024, with the conclusion of roadworks at the entrance of Ospedale Santa Maria Annunziata, Via dell’Antella will be reopened to traffic in the stretch in front of the hospital.
Service will therefore return to normal.

#at_Firenze

Due to works related to the construction of the T2 tram line Piazza della Libertà - Lavagnini - Stazione, for the 330A, 322A, 350A, 365A, 360A, and 353A lines, a new stop has been established at Piazza Libertà (right side Logge - Poste) coming from Viale Matteotti, towards Via Lavagnini.

#at_FIrenze dal 15/1 fino a fine lavori in Piazza Peruzzi le linee 350A-351A-353A sono così deviate:

Direzione Osteria Nuova - Incisa Valdarno
…via Brigate partigiane - via Simone degli Antelli- via Ubaldino Peruzzi da dove riprende il regolare percorso

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map