Skip to main content


PRATO - CAMPI BISENZIO - FIRENZE

212

Winter timetable (from 15/09)

Download line timetable and map

212

#at_Prato

🚧 from 09:00 on Monday 10th March 2025 and until the end of the roadworks for the restoration of the road surface and the resurfacing, the reserved lane of via Francesco Baracca in Florence will be closed to traffic in the section between via Pistoiese and via Pratese. Therefore, the line will have to make the following temporary diversion.

Direction PRATO
From via F. Geminiani, diverted services on Viale L. Gori, via F. Martucci, via F. Basili, via Pratese, then regular route.

👉🏼 services do NOT make stops on the diversion route.

#at_Prato from Thursday 20th February 2025 and until the completion of the roadworks for the external refurbishment of the electrical cabin serving the San Paolo school complex in Via Giuseppe Dossetti in Prato, the stop named “DOSSETTI 2” (first stop located on Via G. Dossetti with a north/central city route), will be temporarily moved back by about 50 metres, to the area specifically equipped/set up. 🚏

212

#at_Prato

🛒 From 13:00 until 21:30 on all Saturdays from September 2024 until June 2025, in order to allow the holding of the weekly local market during the winter period, Via Bruno Buozzi in Campi Bisenzio (FI) will be closed to traffic in the section between Via Vittorio Veneto and Via Tintori. Therefore, the line will have to carry out the following temporary diversion 🔄

Direction CAMPI BISENZIO/FIRENZE
From Via Vittorio Veneto, services diverted onto Via G. Verdi, Via Trieste, Via B. Buozzi, then regular route.

🚏 The stops CAMPI B.ZIO VITTORIO VENETO and BUOZZI PUCCINI will be temporarily suspended.

👉🏼 Services will stop on request at the existing stop located on Via G. Verdi, active only on market days.

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map