Skip to main content


CAMPAGNATICO-GROSSETO

5/G

Winter timetable (from 15/09)

Download line timetable and map

#at_Grosseto due to roadworks of the Acquedotto del Fiora from Monday 26th August 2024 until the end of the works, the stops G0054 and G0055 on the Siena road towards the centre will be suspended, all affected lines 0g2; 0g3; 25R; 3/G 5/G do not stop at the aforementioned stops.

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map