Skip to main content


Status updates at Pistoia

Latest Status Updates

#at_Pistoia

🚧🔄Due to roadworks on Via del Villone in Pistoia, from Monday 20th to Wednesday 22nd January 2025, between 08:30 and 16:00, line 24 will undergo a diversion.

Line 24 towards Valdibrana:
Regular route until Via dello Stadio; then Via Donatori del Sangue, Via delle Olimpiadi, Via M. Marini, Via di Valdibrana, then back to regular route.

Line 24 towards Pistoia:
Reverse route. At the…

#at_Pistoia

🚧🔄Due to roadworks on Via Bramalegno, in the Anchione area (Ponte Buggianese), from Monday 20th January 2025, for the entire duration of the service and until the completion of the roadworks, lines 701, 702, and 851 will be on diversion.

Lines 701, 702, 851 (passing through Anchione):
Regular route until Via Piave, then instead of turning, continue along Via Piave, then Via…

#at_Pistoia

🚧🔄Due to roadworks on Via di Piuvica in the Corsini Bianchi and Neri area (Pistoia), on Monday 20th and Tuesday 21st January 2025, the 85 Ger line will make the following route changes.

85 Ger line service at 07:05 from Piazza San Francesco:
Regular route until Germinaia, then turnaround at the Cemetery, via Collegigliato, via M. Tasselli, via Collegigliato, via Bigiano and Castel…

#at_Pistoia

⚠️🔄Due to the closure to traffic due to a landslide on SP 37 Via Risorgimento, in the locality of Cutigliano (municipality of Abetone - Cutigliano), from Thursday 16th January 2025 for the entire duration of the service and until normal traffic conditions are restored, lines 65, 465 and CUT will make the following route changes:

Line 65 Casotti-Cutigliano Funivia:
All connecting…

#at_Pistoia

🚧🔄Due to roadworks for asphalting in via Antonio Gramsci in Massa e Cozzile, from Monday 13th January 2025 between 08:00-18:00 (excluding Saturday and Sunday) until the end of the roadworks, lines 702 and 851 will undergo a diversion.

Lines 702 and 851 from Montecatini Terme towards Pescia - Chiesina Uzzanese - Altopascio - Lucca:
From via Marruota, upon reaching the roundabout of…

#at_Pistoia

🚧🔄From Tuesday 7th January 2025 and until the end of the roadworks, lines 60, 701, 703, 801, 802, and U804 will undergo a diversion due to roadworks on via Sardegna in Montecatini Terme.

The services will follow the regular route until the roundabout of via C. Colombo, then continue on Viale G. Marconi, via B. Fanciullacci, via Mezzomiglio SR435, before resuming the normal itinerary…

#at_Prato

🚧 From 09:00 on Tuesday 7th January 2025 and until the completion of urgent roadworks for the safety of the drinking water network, a one-way traffic system will be established on Via di Oste in the locality of Oste in the municipality of Montemurlo (PO), in the section between Via Scarpettini and Via Enrico Toti in the direction of the latter. Therefore, the lines will have to make the…

#at_Prato

🚧 From the start of service on Tuesday 7th January 2025 and until the completion of roadworks on the drinking water network, Via Roma in Agliana (PT) will be closed to traffic at the intersection with Via della Repubblica. Therefore, the line will have to make the following temporary diversions 🔄

Direction AGLIANA ordinary route
From Via Provinciale, services diverted onto Via del…

#at_Pistoia

🚧🔄Due to roadworks along the Via Montalbano SP 6, in the municipality of Quarrata, from Tuesday 7th January 2025 until the end of the roadworks, lines 13, 13V, 61, and 51PQF will undergo a diversion.

Line 13V from Quarrata towards Poggio a Caiano
Line 51PQF from Quarrata towards Florence:
Regular route until Via Montalbano, then Via Antonio Gramsci, Via Filippo Brunelleschi, Via…

Back to top

Interactive map